Hornsby DCP and LEP controls for house DAs

Hornsby LEP 2013 and Hornsby DCP 2024 apply to house DAs in Hornsby Shire. Check the zone first: Part 3.1 covers R2 houses and additions, with separate controls for rural land and river settlements, and additional heritage controls where relevant.

Checked against the plans in force on 5 October 2026.

Which plans apply

Key controls for a house

R2 Low Density Residential: dwelling houses, Hornsby DCP 2024 Part 3.1

Front setback6m to local roads; 9m to designated roads and roads in Cherrybrook; 3m to Brooklyn Road, Brooklyn. Existing local-road setbacks of 7.6m or more may need to be maintained.Hornsby DCP 2024 Part 3, Table 3.1.2-a; Part 10, Appendix C
Side setback0.9m minimum for elements up to 1 storey and no higher than 4.5m above existing ground; 1.5m for a 2 storey element. Retained landscape features may require more.Hornsby DCP 2024 Part 3, 3.1.2(a), (b), (g), Table 3.1.2-a
Rear setback3m minimum for elements up to 1 storey and no higher than 4.5m above existing ground; 8m for a 2 storey element. Retained landscape features may require more.Hornsby DCP 2024 Part 3, 3.1.2(a), (b), (g), Table 3.1.2-a
Height and storeys8.5m where the Height of Buildings Map marks Area I; check your lot. At that height, the DCP permits 2 storeys plus attic, excluding basement carparking.Hornsby LEP 2013 cl 4.3; Hornsby DCP 2024 Part 3, 3.1.1(a), Table 3.1.1-a
Maximum dwelling-house floor area90% of lot area for 200–249m² lots; 85% for 250–299m²; 270m² for 300–449m²; 330m² for 450–599m²; 380m² for 600–899m²; 430m² for 900m² or larger, using the DCP floor-area definition.Hornsby DCP 2024 Part 3, 3.1.1(l), Table 3.1.1-c and notes
Minimum landscaped area10% for 200–299m² lots; 15% for 300–449m²; 20% for 450–599m²; 30% for 600–899m²; 40% for 900–1499m²; 45% for 1500m² or larger. Areas counted should be at least 1.5m wide.Hornsby DCP 2024 Part 3, 3.1.3(a), (b), Table 3.1.3-a
Maximum site coverage65% for 200–249m² lots; 60% for 250–299m²; 55% for 300–449m²; 50% for 450–899m²; 40% for 900–1499m²; 30% for 1500m² or larger, subject to the single storey exception below.Hornsby DCP 2024 Part 3, 3.1.1(j), Table 3.1.1-b and notes
Site coverage exception55% maximum for a single storey dwelling house and all ancillary development on a lot of at least 450m² but less than 500m².Hornsby DCP 2024 Part 3, 3.1.1(k)
Principal private open space16m² minimum for lots 6–9m wide at the building line; 24m² for lots 10m or wider, each with a 3m minimum dimension. It should be behind the front building line and is to be directly accessible from living areas.Hornsby DCP 2024 Part 3, 3.1.4(a), (b), Table 3.1.4-a
Car parking1 space per dwelling with 0–2 bedrooms; 2 spaces with 3 or more bedrooms, behind the front building line.Hornsby DCP 2024 Part 1, Table 1.3.2-c; Part 3, 3.1.7(a)

Issues to resolve before you lodge

  1. 1

    Sunlight to private open space

    50% of the required principal private open space for both the proposed dwelling and any adjoining property should receive 3 hours of unobstructed sunlight between 9am and 3pm on 22 June (Hornsby DCP 2024 Part 3, 3.1.5(a), (b)).

  2. 2

    Window privacy

    Above 1m floor height from existing ground, a habitable-room window other than a bedroom window should have a privacy screen if it is less than 3m from a side or rear boundary and its sill is below 1.5m (Hornsby DCP 2024 Part 3, 3.1.6(b)).

  3. 3

    Tree protection

    Buildings, ancillary structures, driveways, drainage and service trenches should be set back from significant trees to be retained in accordance with AS 4970 (Hornsby DCP 2024 Part 3, 3.1.3(f)).

Documents you may need

  • Arboricultural impact assessment where works may affect protected trees, with a tree protection plan for works within 10m of existing trees: DCP 1.2.6.1 and 3.1.3(f); DA Submission Guideline sections 13–14.
  • Stormwater concept plan for new work and alterations or additions that increase impervious area, showing the outlet, overland flow and any detention, plus downstream owner consent where an easement is required: DCP 1.3.1.2; DA Submission Guideline section 19.
  • Geotechnical slope-stability certification for gradients exceeding 20% above Mean High Water Mark, with a report also potentially required for steep land, existing fill or extensive excavation: DCP 1.3.1.4(e); DA Submission Guideline section 28.
  • Bushfire risk assessment and certification identifying construction and asset protection requirements for house DAs on mapped bushfire prone land, with the RFS Single Dwelling Application Kit available for smaller proposals: DCP 1.3.3.1 and notes.

Check your plans against Hornsby’s rules

$249. Key figures recomputed from your plans and the issues council is likely to raise, each with a fix, in under 24 hours.

Check a DA

Questions

What is the Hornsby DCP side setback?

In R2, allow 0.9m for elements up to 1 storey and no higher than 4.5m above existing ground, or 1.5m for a 2 storey element. Retained landscape features may require a greater setback under DCP 3.1.2(g).

How much landscaped area does Hornsby require?

DCP Table 3.1.3-a sets 20% for 450–599m² lots, 30% for 600–899m², 40% for 900–1499m² and 45% for 1500m² or larger, with smaller-lot bands listed above. Areas counted should be at least 1.5m wide, and at least 50% of the minimum should be behind the primary-road building line.

Which Hornsby DCP parts apply to my site?

Use Part 1 with Part 3.1 for R2 houses, Part 2 for the defined rural area or Part 8 for the defined river settlements, checking their application maps. Part 9 adds controls for heritage items, conservation areas and development nearby; Part 6 adds subdivision controls.

General information, not planning advice. Plans change and some controls are mapped lot by lot: check the current LEP and DCP, and the planning certificate for your lot, before relying on a figure.

Other councils